Project: DaveBellairs   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Dave Bellairs   -  
Project:   Vans - RV-7   -   VIEW REPORTS
Total Hours:1467.9
Total Flight Time:
Start/Last Date:Jun 24, 2017 - No Finish Date
Engine:Lycoming IO-360
Propeller:Whirlwind 200RV
Panel:Advanced Flight Systems Avionics
 
Friendly URL: https://eaabuilderslog.org?s=DaveBellairs

Home or Last Project Picture

Nov 29, 2022     Elevator trim wires - (1 hour)       Category: Avionics
Installed several plastic snap in bushings in the aft bulkheads that were predrilled for wires. Ran a five strand 20 AWG wire to the tail for the elevator trim. Plan to install some wire tie downs on the floor of the fuse to secure the wires for the taillight, elevator servo and ELT.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.